We have provided on-going installation and support for the university from a single additional outlet to rewiring the main Comms room. During this time we have:

  • Introduced and implemented the TE (Krone) solution for the University.
  • Designed and installed a computer room providing a 10Gig Cat6A TE (Krone) solution.
  • For the last three years have been operating a rapid response break/fix contract alongside rapid response surveys and installations.
  • Working night shifts and phasing works within time term whilst remaining adaptable to changing requirements.
  • Successfully demonstrating our ability to work and build long term positive relationships by providing whole system solutions within a thriving occupied academic environment by learning what is of paramount importance to the working of the University.